If you didn't catch it in the title, there was some sarcasm in there. Gamebryo (the game engine used to make LEGO Universe as well as other titles such as Fallout 3, Oblivion, Epic Mickey, and more) had some very annoying quirks that made my life a little bit more difficult, as well as some of my coworkers'.
Both the Matrix and the Quaternion classes had multiple ways to create rotations, and naturally Gamebryo used no naming convention between these two classes.
Create a Rotation from the X axis and an angle?
Matrix function: MakeXRotation(float angle)
Quaternion function: FromAngleAxisX(float angle)
Gamebryo included a lot of functionality in either the Matrix or Quaternion classes, but not both. It's like a cruel joke.
Want to make your matrix an identity matrix? Call 'MakeIdentity( )'. Want to do that with a Quaternion? Do it yourself, there is no function.
Want to lerp (linearly interpolate) a Quaternion? Go for it. Want to lerp a Matrix? Sorry, convert it to a Quaternion, lerp it, then convert it back to a matrix. On top of that, the Slerp (spherical linear interpolation) did not even work properly with Gamebryo, often causing objects to rotate 350 degrees to get to the target, rather than 10 degrees. We ended up discontinuing the use of Gamebryo's Slerp method altogether and calling to Havok to have it do the rotations for us. Alternatively we could have just rolled our own Slerp code or altered Gamebryo's version to use ours, but Gamebryo made calls internally to its Slerp method so we didn't want to break something by fixing something.
Gamebryo also thought it would be cute to use opposite rotation directions for matrices vs. quaternions. Those two rotation functions I listed earlier, if you want to represent the same rotation with a matrix as well as a quaternion you pass a positive angle into one, and a negative angle into the other. It's always fun to try and remember which way you need to rotate which type depending on the case you were using it in. Gamebryo likes to make sure the programmer is paying attention I guess.
Here's another little chestnut that Gamebryo left me to deal with. Their camera coordinate system has a 'forward' vector of X, rather than Z. Seriously? What game has EVER done that? For those new to game programming, about 90% of games use the X-axis as a 'right' vector, and Z as a 'forward', the other 10% use the Y-axis as the forward and the Z-axis as the 'up'. But I had never seen an X-axis be used for a 'forward' before. There was no way we were going to use the X-axis as the forward for LEGO Universe, so we ended up having to deal with Gamebryo's wacky camera coordinate system. It was always a fun task when trying to do something that involved aligning the camera based on a rotation that was in another system, you'll set them to the same rotations and then rotate the camera 90 degrees to line it up.
I might go more into some annoyances using Gamebryo later, but for now I'm still bound to an NDA on most subjects.
A blog by a professional game developer, about game programming and development. My posts will range in comments from beginners to game development to those at a more advanced level.
Saturday, November 12, 2011
Calculus: Network prediction, calculating time to travel a distance
In the last post we talked about how we could calculate how far something traveled over a specific amount of time based on its velocity and acceleration. In that post we were left with a problem, we know our origin and destination positions, and how much time has elapsed, and after a certain amount of time we found we had past the destination. What we really need to know now is how long it will take us to get to our destination given our velocity and acceleration, that way we know how much time is left after we got to the destination.
Given the path above, we had calculated that after 1 second we were almost to P2 if we had started at P1. But what if the client's game had stuttered for 2 full seconds? Where would we put them along the way then? Well, to know that we need to know how long it takes to get from P1 to P2.
Here is the formula for calculating how long is takes to travel a specific distance given an initial velocity and a constant acceleration:
't' is time, v(i) is initial velocity, 'a' is acceleration, and 'd' is the distance between the points.
Our initial velocity is 5 meters per second.
Our constant acceleration is 3.591849, which we calculated in the last blog post.
Distance is 8.9796225, which was also calculated in the last blog post.
If we plug the numbers in we get:
Time = ( -5 + √(5² + 2 * 3.591849 * 9.9796225) ) / 3.591849
= ( -5 + √(25 + 71.690594) ) / 3.591849
= ( -5 + √96.690594 ) / 3.591849
= ( -5 + 9.8331375 ) / 3.591849
= 4.8331375 / 3.591849
Time = 1.3455868 seconds
And here's the code:
Alright, time to figure out some values:
Difference vector between P2 and P3 = (18 - 10, 5 - -3) = (8, 8)
Length of difference vector = √(8² + 8²) = √128 = 11.3137085
Constant accel = (5² - 10²) / (2 * 11.3137085) = (25 - 100) / 22.627417 = -3.3145630
Notice our constant acceleration was negative, that is because we slow down when going from P2 to P3. Now that we have all of our values we can calculate the time it takes to travel distance from P2 to P3 given the initial velocity, and the acceleration we just calculated.
Time = (-10 + √(-10² + 2 * -3.3145630 * 11.3137085) ) / -3.3145630
= (-10 + √(100 + -75.0) ) / -3.3145630
= (-10 + 5 ) / -3.3145630
= -5 / -3.3145630
Time = 1.5084944 seconds
We can clearly see that the time we have remaining (~0.65 seconds) isn't enough to reach P3 (~1.51 seconds), so lets see how far we make it.
Distance = 10 * 0.6544132 + (-3.3145630 * 0.6544132² * 0.5)
= 6.544132 + (-3.3145630 * 0.4282566 * 0.5)
= 6.544132 + -0.7097417
Distance = 5.8343903 meters
And now we need to figure out the direction, which we have some of the data for from earlier:
Inverse length of difference vector = 1 / 11.3137085 = 0.08838835
Unitized difference vector from P2 to P3 = (8 * 0.08838835, 8 * 0.08838835)
= (0.7071068, 0.7071068)
And now that we have distance and direction, we multiply them and add it to P2 to get our final position after 2 seconds:
Position = P2 + ( distance * direction )
= (10, -3) + ( 0.7071068 * 5.8343903, 0.7071068 * 5.8343903 )
= (10, -3) + ( 6.5414971, 6.5414971 )
Position = ( 16.5414971, 3.5414971 )
And there we have it, we just predicted the position of a platform 2 seconds into the future along a strict path.
Here is the formula for calculating how long is takes to travel a specific distance given an initial velocity and a constant acceleration:
't' is time, v(i) is initial velocity, 'a' is acceleration, and 'd' is the distance between the points.
Our initial velocity is 5 meters per second.
Our constant acceleration is 3.591849, which we calculated in the last blog post.
Distance is 8.9796225, which was also calculated in the last blog post.
If we plug the numbers in we get:
Time = ( -5 + √(5² + 2 * 3.591849 * 9.9796225) ) / 3.591849
= ( -5 + √(25 + 71.690594) ) / 3.591849
= ( -5 + √96.690594 ) / 3.591849
= ( -5 + 9.8331375 ) / 3.591849
= 4.8331375 / 3.591849
Time = 1.3455868 seconds
And here's the code:
float CalcTimeOverDistance( float initVelocity,
float constantAccel,
float distance )
{
if ( distance <= 0.0f )
{
return 0.0f;
}
// If there is an acceleration present
if ( constantAccel != 0.0f )
{
float initVelSqr = initVelocity * initVelocity;
return (-initVelocity
+ sqrt(initVelSqr + (2*constantAccel*distance))
/ constantAccel;
}
else // No acceleration was present
{
if ( initVelocity == 0.0f )
{
// No velocity or acceleration means infinite
// time required, just return 0.0f, or whatever
// value you want to return in this case.
return 0.0f;
}
else
{
return ( distance / initVelocity );
}
}
}
So now we can see that the platform will reach P2 in only 1.3455868 seconds, and because the client stuttered for 2 seconds that leaves us 0.6544132 seconds we need to predict. The next step is to see how much time it takes to get from P2 to P3, and if that is greater than 0.6544132 seconds than we need know we're not to P3 yet and we can calculate how far we've traveled between P2 and P3. Alright, time to figure out some values:
Difference vector between P2 and P3 = (18 - 10, 5 - -3) = (8, 8)
Length of difference vector = √(8² + 8²) = √128 = 11.3137085
Constant accel = (5² - 10²) / (2 * 11.3137085) = (25 - 100) / 22.627417 = -3.3145630
Notice our constant acceleration was negative, that is because we slow down when going from P2 to P3. Now that we have all of our values we can calculate the time it takes to travel distance from P2 to P3 given the initial velocity, and the acceleration we just calculated.
Time = (-10 + √(-10² + 2 * -3.3145630 * 11.3137085) ) / -3.3145630
= (-10 + √(100 + -75.0) ) / -3.3145630
= (-10 + 5 ) / -3.3145630
= -5 / -3.3145630
Time = 1.5084944 seconds
We can clearly see that the time we have remaining (~0.65 seconds) isn't enough to reach P3 (~1.51 seconds), so lets see how far we make it.
Distance = 10 * 0.6544132 + (-3.3145630 * 0.6544132² * 0.5)
= 6.544132 + (-3.3145630 * 0.4282566 * 0.5)
= 6.544132 + -0.7097417
Distance = 5.8343903 meters
And now we need to figure out the direction, which we have some of the data for from earlier:
Inverse length of difference vector = 1 / 11.3137085 = 0.08838835
Unitized difference vector from P2 to P3 = (8 * 0.08838835, 8 * 0.08838835)
= (0.7071068, 0.7071068)
And now that we have distance and direction, we multiply them and add it to P2 to get our final position after 2 seconds:
Position = P2 + ( distance * direction )
= (10, -3) + ( 0.7071068 * 5.8343903, 0.7071068 * 5.8343903 )
= (10, -3) + ( 6.5414971, 6.5414971 )
Position = ( 16.5414971, 3.5414971 )
And there we have it, we just predicted the position of a platform 2 seconds into the future along a strict path.
Friday, November 11, 2011
Calculus: Network prediction, calculating distance over time
I've actually found that I rarely need to use any calculus in most game programming I run into. Games are generally frame-based, and as such you can generally just update variables each frame by the elapsed time. One of the main benefits of calculus is when you need to know what a value is at any given point in time, so it's very valuable when you're trying to predict where something will be after a given amount of time, and prediction is very common in any networked game.
I used a similar method to this while developing LEGO Universe's moving platform system, a system which lets the player ride upon a moving object to travel short or long distances. If a client's program had hitched for a small amount of time while on the platform, the platform would naturally see a larger gap of time had elapsed, and Havok's physics would usually accurately calculate where the platform should end up. However, we had to limit how much time we were able to skip all at once because if the client make their game hitch for a long period of time, say 5 seconds, and we let Havok just move everything ahead 5 seconds based on their current velocity, we could potentially have the player going places where they shouldn't be able to go. I can go into more detail some other time on this subject, but suffice to say we couldn't always just allow the game to move objects large distances because a large time had elapsed between frames.
The moving platform system had unique prediction algorithms because it had invisible predefined rails it had to stay on, and at each waypoint it had a speed it must be traveling at the moment it got to that point. Based on defined points on these paths, and speeds at those points, we should be able to determine exactly where a moving platform should be after any amount of elapsed time.
The image below represents a simple path for a moving platform to follow, and at each point I've labeled the speed that moving platform must be going at the time it reaches at point. So basically what this image says is when the platform leaves P1, it will be moving at 5 meters per second, and it will have a constant acceleration all the way to P2, and by the time it reaches P2 it will be moving at 10 meters per second. As it leaves P2 it will decelerate constantly such that it will be moving at 5 meters per second as it reaches P3. Long story short, it speeds up until it gets to P2, and then slows down again as it reaches P3.
In order to calculate where a platform could be at any time we need to know its acceleration. If the platform wasn't accelerating, calculating it's position at any time would be extremely simple, and would just be:
Position += Velocity * Time;
But because velocity is constantly changing as the platform speeds up and slows down along its journey, we'll need calculus to tell us what the acceleration is between the two points a platform currently lies, and then we can use that acceleration to calculate the distance traveled.
So to keep the scenario as simple as possible, lets just calculate where the platform will be after 1 second if it begins at P1.
Difference vector from P1 to P2 = (10 - 0, -3 - 0) = (10, -3)
Length of difference vector = √(10² + -3²) = √(100 + 9) = √109 = 10.440306 meters
The formula for calculating constant acceleration is:
v(f) is final velocity, v(i) is the initial velocity, and 'd' is distance it will be travelling.
The code for this is:
I used a similar method to this while developing LEGO Universe's moving platform system, a system which lets the player ride upon a moving object to travel short or long distances. If a client's program had hitched for a small amount of time while on the platform, the platform would naturally see a larger gap of time had elapsed, and Havok's physics would usually accurately calculate where the platform should end up. However, we had to limit how much time we were able to skip all at once because if the client make their game hitch for a long period of time, say 5 seconds, and we let Havok just move everything ahead 5 seconds based on their current velocity, we could potentially have the player going places where they shouldn't be able to go. I can go into more detail some other time on this subject, but suffice to say we couldn't always just allow the game to move objects large distances because a large time had elapsed between frames.
The moving platform system had unique prediction algorithms because it had invisible predefined rails it had to stay on, and at each waypoint it had a speed it must be traveling at the moment it got to that point. Based on defined points on these paths, and speeds at those points, we should be able to determine exactly where a moving platform should be after any amount of elapsed time.
The image below represents a simple path for a moving platform to follow, and at each point I've labeled the speed that moving platform must be going at the time it reaches at point. So basically what this image says is when the platform leaves P1, it will be moving at 5 meters per second, and it will have a constant acceleration all the way to P2, and by the time it reaches P2 it will be moving at 10 meters per second. As it leaves P2 it will decelerate constantly such that it will be moving at 5 meters per second as it reaches P3. Long story short, it speeds up until it gets to P2, and then slows down again as it reaches P3.
In order to calculate where a platform could be at any time we need to know its acceleration. If the platform wasn't accelerating, calculating it's position at any time would be extremely simple, and would just be:
Position += Velocity * Time;
But because velocity is constantly changing as the platform speeds up and slows down along its journey, we'll need calculus to tell us what the acceleration is between the two points a platform currently lies, and then we can use that acceleration to calculate the distance traveled.
So to keep the scenario as simple as possible, lets just calculate where the platform will be after 1 second if it begins at P1.
Difference vector from P1 to P2 = (10 - 0, -3 - 0) = (10, -3)
Length of difference vector = √(10² + -3²) = √(100 + 9) = √109 = 10.440306 meters
The formula for calculating constant acceleration is:
v(f) is final velocity, v(i) is the initial velocity, and 'd' is distance it will be travelling.
The code for this is:
float CalculateConstantAccel(const float initVelocity,
const float finalVelocity,
const float distance)
{
if ( distance <= 0.0f )
{
return 0.0f;
}
float finalVelocitySqr = finalVelocity * finalVelocity;
float initVelocitySqr = initVelocity * initVelocity;
return (finalVelocitySqr - initVelocitySqr)
/ (2 * distance);
}
Plugging our values in we get:
Acceleration = (10² - 5²) / (2 * 10.440306) = (100 - 25) / 20.880612 = 3.591849
Knowing our constant acceleration, we can now calculate where the platform will be in 1 second. Here's the formula for calculating distance over time given a constant acceleration:
'd' is distance, v(i) is the initial velocity, 't' is time, and 'a' is the acceleration we already calculated above.
The code for this is:
float CalcDistanceOverTime(const float initVelocity,
const float constantAccel,
const float timeDelta)
{
return (initVelocity * timeDelta)
+ (0.5f * constantAccel * (timeDelta * timeDelta);
}
Plugging our values in we get:
Distance = 5 * 1 + ( 0.5 * 3.591849 * 1² ) = 5 * 1.7959245 = 8.9796225
So the moving platform will have traveled 8.9796225 meters after 1 second, which puts it pretty close to P2, which was 10.440306 meters away. In fact, we know the direction between P1 and P2, so if we want to put the platform where is should be we can move it there based on the distance we calculated. Our difference vector from P1 -> P2 was (10, -3). We need to unitize it to make it a direction vector, and we already have the length of the vector so that saves us another step. Inverse length is = 1 / 10.440306 = 0.0957826 Unitized difference vector is ( 10 * 0.0957826, -3 * 0.0957826 ) = (0.957826, -0.2873478) And now we just multiply our direction vector by the distance we need to travel and then add it to P1: P1 + ( distance * ( direction )); New position = (0, 0) + ( 8.9796225 * (0.957826, -0.2873478)) = ( 8.600916, -2.5802747 ) So as you can see, our position after 1 second is approx ( 8.6, -2.58 ), which puts it close to P2, which is at (10, -3).
That concludes this blog post, but here's some food for thought: What if the client's game had hitched for 2 seconds? That would've put them far past P2, so you end up needing an algorithm to figure out how much time it took to reach P2, then based on the remain time left from the original 2 seconds you have to figure out how far they went between P2 and P3. Stay tuned for the solution to this in the next blog post.